
New TopShim run:

version = topshim 2.0.0
date = 2022-07-13
time = 12:49:42.107
command = topshim  convcomp rga

FINE SHIMMING

Parameters:

probe = Z168777_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.312

shim changes: 
Z	+38
Z2	-26
Z3	-48
Z4	-121
Z5	+132
Z6	+480
Z7	-847
Z8	-2625

duration = 53 sec
completed successfully
finished Wed Jul 13 12:50:33 2022


========================================================================
